DEV Community

#medtech

Posts

đź‘‹ Sign in for the ability to sort posts by relevant, latest, or top.
The dead link in our legacy DHF ate a sprint. Now traceability is a living system.

The dead link in our legacy DHF ate a sprint. Now traceability is a living system.

Comments
4 min read
A stack of SOPs won't stop a retrained model from shifting your risk file overnight

A stack of SOPs won't stop a retrained model from shifting your risk file overnight

Comments
4 min read
One NCR form to rule them all stopped working the day we added our 30th supplier

One NCR form to rule them all stopped working the day we added our 30th supplier

Comments
4 min read
Form builders are not workflow engines: a CMO's eQMS shortlist problem

Form builders are not workflow engines: a CMO's eQMS shortlist problem

Comments
4 min read
Why your template fix didn't propagate — and why that's the right design

Why your template fix didn't propagate — and why that's the right design

Comments
3 min read
The quiet case for keeping ISO 27001 and ISO 13485 evidence in one eQMS

The quiet case for keeping ISO 27001 and ISO 13485 evidence in one eQMS

Comments
4 min read
The cloud shift helps. The partner-program pitch doesn't reach a CMO.

The cloud shift helps. The partner-program pitch doesn't reach a CMO.

Comments
3 min read
Six eQMS platforms for a mixed medtech-and-industrial shop — and which one I'd pick

Six eQMS platforms for a mixed medtech-and-industrial shop — and which one I'd pick

Comments
4 min read
Questioning the medtech "partner program" — when a broker is just a broker

Questioning the medtech "partner program" — when a broker is just a broker

Comments
4 min read
A partner-side QMS rollout playbook — five phases I run the same way at every client

A partner-side QMS rollout playbook — five phases I run the same way at every client

Comments
4 min read
The 0.87 problem: when semantic linking makes inconsistent records look connected

The 0.87 problem: when semantic linking makes inconsistent records look connected

Comments
4 min read
Training CYA: when "complete all assigned modules" blocks engineers from a PLM they actually need

Training CYA: when "complete all assigned modules" blocks engineers from a PLM they actually need

Comments
4 min read
Audit-readiness isn't a pre-audit sprint — three daily habits from a quality engineer's notebook

Audit-readiness isn't a pre-audit sprint — three daily habits from a quality engineer's notebook

Comments
4 min read
When a Dropped Frame Becomes a Clinical Problem

When a Dropped Frame Becomes a Clinical Problem

Comments 1
8 min read
21 CFR Part 11 is where 'approve by email' shops quietly fail — a typed name is not a signature

21 CFR Part 11 is where 'approve by email' shops quietly fail — a typed name is not a signature

Comments 1
4 min read
đź‘‹ Sign in for the ability to sort posts by relevant, latest, or top.