I went looking for where a $1 tree kit's margin floor actually fires, in Python
A $1 tree-service kit ships a hard rule and then ships five examples that never exercise it. I rebuilt every number in the archive in Decimal, then computed the boundary the examples skip. Here is the code, the numbers and the two places the kit disagrees with itself.
from decimal import Decimal as D, ROUND_HALF_UP
R2 = lambda x: D(x).quantize(D("0.01"), rounding=ROUND_HALF_UP)
LOADED = D("42.16") # the kit's loaded crew hour, from its own 7-line build-up
Why a floor that never fires is a bug in the examples, not the rule
File 02 of the archive says: "any estimate under a 0.35 margin rate gets re-priced or declined." File 05 makes it step 2 of the quoting SOP. That is a real guardrail — in this trade the expensive mistake is quoting too low, not too high.
Then the five worked trees come in at 71.63, 77.08, 71.48, 68.15 and 73.29 percent. The worst is 33.15 points clear of the floor. Not one example shows the rule doing anything. A reader calibrating against the worked set learns that quotes land in the high sixties and learns nothing about the cliff underneath.
The cliff is one line of algebra. With no situation flags the engine's total is h * dbh * 1.95 and the job cost is hours * 42.16 + disposal + 0.78 * miles. So:
floor bites <=> cost > 0.65 * total
<=> h*dbh < cost / (0.65 * 1.95) = cost / 1.2675
loses money <=> h*dbh < cost / 1.95
Two thresholds, both derived from the kit's own constants:
| Cost shape | Job cost | Loses money below h×dbh | Under floor below h×dbh |
|---|---|---|---|
| 3 h, $68 dump, 14 mi (kit's plan-month shape) | 205.40 | 105.33 | 162.05 |
| 2 h, $68, 10 mi (small ornamental) | 160.12 | 82.11 | 126.33 |
| 4 h, $95, 20 mi (heavy debris) | 279.24 | 143.20 | 220.31 |
| 6 h, $68, 40 mi (two-person, long drive) | 352.16 | 180.59 | 277.84 |
The kit's smallest worked tree is h*dbh = 600 — a 30 ft × 20 in oak. That is 3.7× the floor threshold on its own cost shape. Every shipped example lives in the safe zone. The ornamental removal that a one-truck company gets asked to quote twice a week lives on the other side of the line:
def quote(h, dbh, hours, disposal, miles):
total = R2(D(h) * D(dbh) * D("1.95"))
cost = R2(D(hours) * LOADED + D(disposal) + D("0.78") * D(miles))
margin = R2(total - cost)
return total, cost, margin, R2(margin / total * 100)
for h, dbh in [(12,8), (15,10), (18,12), (20,14), (24,16), (30,20)]:
total, cost, margin, pct = quote(h, dbh, "3.0", "68.00", 14)
verdict = ("LOSS" if pct < 0 else
"UNDER FLOOR" if pct < D("35") else "ok")
print(f"{h:2d}ft x {dbh:2d}in h*dbh={h*dbh:4d} "
f"total={total:>8} margin={margin:>8} {pct:>6}% {verdict}")
12ft x 8in h*dbh= 96 total= 187.20 margin= -18.20 -9.72% LOSS
15ft x 10in h*dbh= 150 total= 292.50 margin= 87.10 29.78% UNDER FLOOR
18ft x 12in h*dbh= 216 total= 421.20 margin= 215.80 51.23% ok
20ft x 14in h*dbh= 280 total= 546.00 margin= 340.60 62.38% ok
24ft x 16in h*dbh= 384 total= 748.80 margin= 543.40 72.57% ok
30ft x 20in h*dbh= 600 total= 1170.00 margin= 964.60 82.44% ok
A 12 ft × 8 in removal quotes 187.20 against a 205.40 cost. It is not thin. It is a loss.
The six triggers are three gates dressed as six
File 01 lists six tests for buying truck two and says meet them all. Two are jobs-per-month thresholds that cannot both be binding:
- Trigger 1: 15+ billed jobs/month for 3 straight months
- Trigger 3: 20+ billed jobs/month for a full quarter
A quarter is three months and 20 > 15, so satisfying #3 always satisfies #1. Trigger 1 can never be the constraint. The real jobs test is 20/month.
That matters because of where 15 sits. The kit's own break-even is 14.10 jobs → 15 whole jobs, so trigger 1 fires on the first profitable job count there is — clearing 17,870.76 of fixed costs by about 1,134.24.
Trigger 2 is worse, and it is the interesting one:
| Line | Value |
|---|---|
| Trigger 2 threshold (75% of plan) | 23,491.25 |
| Expenses at that revenue (fixed base) | 21,318.41 |
| NOI | 2,172.84 |
| Plan-month NOI | 10,003.26 |
| Revenue down | 25.00% |
| NOI down | 78.28% |
A 25 percent revenue miss destroys 78 percent of the profit, because the expense base barely moves. That is operating leverage — precisely what a "don't buy early" trigger is meant to guard against — and the trigger lets a truck through while it is in full force. At that threshold the first truck needs 5.68 months of its own performance to cover truck two's low band of 12,350.00, before truck two has any overhead.
"Copy the ties, don't recompute" is testable, and it's right
The kit freezes two half-up rounding ties and tells you to copy them. That sounds fussy. It isn't:
a, b = D("62643.34"), D("0.75")
print(a * b) # 46982.5050
print("%.2f" % (float(a)*float(b))) # 46982.50 <- a cent low
print((a*b).quantize(D("0.01"), rounding=ROUND_HALF_UP)) # 46982.51
277.875 is 277 + 7/8, exactly representable in binary, so float gets it right by luck:
1852.50 * 0.15 = 277.875, formats to 277.88. ✓
46982.505 is not representable. The stored double is 46982.504999999997, which formats to 46982.50 — a cent below the frozen answer, on the two-truck ladder. Replace the kit's Decimal with floats and you get one tie right and one wrong, and the wrong one is the one in the growth table.
What footing can and cannot prove
I wrote an independent verifier importing nothing from the kit's checker and re-derived every published number in Decimal: five-job engine field by field, crew chain, P&L, startup ladder for 1–5 trucks, revenue ladder, seeded job log, break-even chain. 136 checks, all exact, zero deltas. The kit's checker passes 8/8 on its own, unchanged.
Footing is a narrow claim and it is worth stating exactly. It proves the arithmetic agrees with itself: given these inputs and this rate card, a stranger reproduces every intermediate value. It does not prove a 20 cu ft load should cost that in your town, or that your wage is 34.00, or that your insurance is 1,450.00 a month.
The kit is direct about this — every price labelled an example figure, three-year financial slots deliberately blank, licence plain personal use, and no testimonials, ratings, customer counts or revenue claims anywhere in the archive. I checked for all of them.
What I'd change if it were mine
Three small things, none of them arithmetic bugs:
- Ship one worked tree below the floor. A 15 ft × 10 in ornamental at 29.78 percent that gets re-priced is worth more than five examples at 70+ percent, because it teaches the reader where the rule lives.
- Collapse trigger 1 into trigger 3, and say out loud that 15 jobs/month is break-even and not a green light.
- Label trigger 2 as a leverage test, not a margin test — and print the NOI at that revenue next to the revenue, so the 25→78 relationship is visible instead of implied.
None of these is a reason not to spend a dollar. The engine foots, the checker works, the guardrails are real; the examples just pick the comfortable side of every line.
Who this is not for
Not a price. Not software — no app, account, CRM, map, invoicing or API integration, just Markdown, CSV and one stdlib Python script. Not a climbing or rigging course, and the kit says so itself. No legal, tax, insurance or licensing advice; the checklist is questions to ask your own state office. Not stump grinding — out of scope. The examples are US-shaped; outside the US, take the method and drop the figures.
Disclosure: this post links to a product we made. If you buy through the link we may earn a commission at no extra cost to you.
Product page: Tree Service Business Starter Kit on Gumroad.
Example figures are illustrative planning inputs — not market rates and not earnings. No legal, tax, insurance, licensing or financial advice. No CRM, map, API or invoicing integrations are claimed because none ship. All names in the worked examples are fictional. Tree work is inherently hazardous; ANSI Z133 and your local rules are the floor, not a ceiling.
Originally published at AI Stack Lab.
Top comments (0)